We manufacture

BLS Facility

Step inside the BLS manufacturing facility, see the standards behind every vehicle, and meet the partners who help us deliver.

01 · Manufacturing facility

We design it.
We build it.
We test it.

Buckler Land Systems manufactures protected vehicles and defence equipment in Nigeria, from the first drawing to the finished, tested system.

Rather than simply showing a factory floor, this page shows the process: engineering, fabrication, welding, armour integration, painting, electrical integration, assembly, inspection and testing, all under one roof and one quality system.

 

Our ability to create concepts, take them through design and build prototypes is the foundation of every programme, from a single civilian conversion to a military platform.

People making products

Engineers, fabricators, welders and inspectors, each phase handled by specialists.

One connected process

Nine stages, each quality checked before the vehicle moves on.

Proof, not promises

Every finished platform is inspected and tested before it is delivered.

The production process

From drawing to delivery in nine stages

Select a stage to see what happens and what is checked.

01 / 09

Engineering

Every platform starts as a concept and a drawing. Engineers define the design, run it through review and build prototypes before production begins.

02 / 09

Fabrication

Raw materials are cut, formed and prepared into the structural parts of the vehicle.

03 / 09

Welding

Skilled welders join structural and armour elements, with each joint inspected before the vehicle moves on.

04 / 09

Armour integration

Ballistic materials are integrated into the vehicle, durable enough to stop penetration and light enough to keep it manoeuvrable.

05 / 09

Painting

Surfaces are prepared, coated and finished to protect the vehicle in demanding environments.

06 / 09

Electrical integration

Wiring, communications and vehicle systems are integrated and retested.

07 / 09

Assembly

Interior, trim, doors, glass and mechanical components are assembled into the finished vehicle.

08 / 09

Inspection

Every vehicle is inspected against its specification and the quality records are completed.

09 / 09

Testing

Finished systems are tested before delivery so that what leaves the plant is field-ready.

Partners & Institutions

Institutions and standards bodies the Group works with.